Joins in GAMS, SQL or R

$
0
0

To produce the charts in (1) I needed to do a multiple join on some data. From the GAMS model in (2) we extract the the following data:

sets
  j
'tasks'  /job1*job10/
  t
'stages'/t1*t10/
;
parameters
   proctime(j,t)
'processing times for each stage'
   machine(j,t)
'machine numbers for each stage (zero based)'
;
variable x(j,t) 'start time of subtask';

What we want to arrive in R is the following:

image

I used approach 1 (pure SQL) in (1), but there are other ways to attack the problem.

Approach 1: pure SQL

Writing this into a SQLite database is very simple:

execute_unload"ft10";
execute"gdx2sqlite -i ft10.gdx -o ft10.db"
;

The database will contain copy of all the data in the model including the symbols we are interested in.

When loading the data we need to do two things:

  1. Join proctime, machine and x on (j,t)
  2. GAMS only stores non-zero elements, which we need to “repair”
  3. Add the end column.

The second issue can be illustrated by looking at the table machine:

image

We miss the records that have a zero value. We can reintroduce them as follows. First we can generate the Carthesian product of J × T using a simple SQL subquery:

image

Adding the machine number to this 100 row table is easy with a left join:

image

The left join added the machine column but the missing values are represented by NA (or NULL in SQL). This is easily fixed:

image

We now add the other columns and also calculate the end column:

image

Approach 2: GAMS + SQL

It is easy in GAMS to do the join. In addition we can use a trick to keep the zeroes:

alias(*,job,stage,attribute);
parameter
report(job,stage,attribute);
report(j,t,
'machine') = EPS
+ machine(j,t);
report(j,t,
'start') = EPS
+ x.l(j,t);
report(j,t,
'duration') = EPS
+ proctime(j,t);
report(j,t,
'end') = EPS
+ x.l(j,t) + proctime(j,t);

execute_unload"ft10"
;
execute"gdx2sqlite -i ft10.gdx -o ft10.db"
;

The EPS is a placeholder for the zeroes. The GAMS parameter report looks like:

image

The GDX2SQLITE tool will map the EPS values into zero’s, so on the R side we see:

image

We need to pivot on the attribute column. Unfortunately this is not completely trivial in SQL:

image

Approach 3: GAMS + R

We keep the GAMS part the same:

alias(*,job,stage,attribute);
parameter
report(job,stage,attribute);
report(j,t,
'machine') = EPS
+ machine(j,t);
report(j,t,
'start') = EPS
+ x.l(j,t);
report(j,t,
'duration') = EPS
+ proctime(j,t);
report(j,t,
'end') = EPS
+ x.l(j,t) + proctime(j,t);

execute_unload"ft10"
;
execute"gdx2sqlite -i ft10.gdx -o ft10.db"
;

On the R side we can read the parameter report as is and pivot using spread from the tidyr package:

image

References
  1. Gantt Chart with R/Plotly, http://yetanothermathprogrammingconsultant.blogspot.com/2017/03/gantt-chart-with-rplotly.html
  2. Playing with job shop problem ft10 (1), http://yetanothermathprogrammingconsultant.blogspot.com/2014/04/playing-with-ft10-job-shop-1.html

Viewing all articles
Browse latest Browse all 809

Trending Articles